Property and Building Glossary: 60 Terms Australian Buyers Should Know
Guide · Updated 2026-10-03 · HousingMarket.com.au
The property industry runs on abbreviations, and every undefined term is a place a buyer can lose money. This glossary defines the sixty terms that matter most for Australians building or buying new in 2026 — from finance (LVR, LMI, genuine savings) through land (covenant, easement, plan of subdivision) to construction (slab, lock-up, PCI, defect liability). Use it as a reference while you read contracts, or skim it before your first builder meeting.
Finance terms
LVR (Loan-to-Value Ratio): loan amount divided by the property value — an 80% LVR means 20% deposit. LMI (Lenders Mortgage Insurance): insurance protecting the lender (not you) when LVR exceeds 80%; typically $10,000–$30,000, often capitalised into the loan. Genuine savings: deposit funds held or accumulated over typically 3–6 months; grants can supplement but rarely replace them. Pre-approval / conditional approval: a lender's indicative commitment subject to valuation and final checks. Construction loan: a loan releasing funds in build stages against invoices and inspections, usually interest-only during construction. Drawdown: each staged release of loan funds. Offset account / redraw: facilities that reduce interest or return extra repayments. Comparison rate: the interest rate including most fees, enabling like-for-like loan comparisons.
Land and legal terms
Settlement: the legal completion of a purchase, when funds transfer and title moves. Cooling-off period: the state-mandated window (typically 5 business days, waivable in auctions) to withdraw from a contract for a small penalty. Plan of subdivision: the registered map carving land into lots; estates sell before (unregistered) or after (registered) registration. Covenant: private building rules registered on title (minimum home size, facade standards). Easement: a right for services or access over part of your land. Encumbrance: any claim on title — mortgage, caveat, covenant. Conveyancer/solicitor: the licensed professional who handles the legal transfer. Deposits bond/guarantee: a substitute for a cash deposit in some purchases. Certificate of Title: the record of ownership and interests in land.
Construction terms
Slab: the concrete foundation, first construction stage. Frame stage: wall and roof framing complete — the first major drawdown point. Lock-up: the home is enclosed (windows, doors, cladding) and weatherproof. Fit-out: internal trades — plaster, joinery, tiling, services fit-off. Practical completion (PC): the builder declares the home complete per contract. PCI (Practical Completion Inspection): your pre-handover defect inspection. Handover: keys exchanged on final payment. Defect liability period: the post-handover window in which the builder must rectify defects, layered on statutory warranty periods (which run for years and vary by state). HIA / MBA contract: the standard industry building contracts used in most states. Variation: a contract amendment to scope, usually costed at a margin. Retention: a withheld portion of final payment pending defect rectification, where agreed. Turnkey: a fixed price including everything needed to move in.
Frequently asked questions
- What is the difference between LMI and mortgage protection insurance?
- LMI protects the lender if you default; it does not protect you. Mortgage protection insurance covers your repayments if you cannot pay due to illness or injury — a different product entirely, sold separately.
- What does 'subject to finance' mean in a contract?
- A condition making the contract depend on loan approval by a stated date. If finance is declined within the period, you can usually withdraw and recover your deposit. Waiving it strengthens an offer but transfers all finance risk to you.
- What is a sunset clause?
- A contract clause setting a deadline (common in off-the-plan and unregistered land) after which either party may rescind if the project has not reached a defined milestone — protecting buyers from indefinite delays.
- Where can I verify builder licensing and warranties?
- Every state has a building authority register (for example, Victorian Building Authority, NSW Fair Trading, Queensland Building and Construction Commission) where licences, insurance and dispute history can be checked before you sign.